Read the full article on smh.com.au (link below)
Due to recent subsea defence contract wins, RADS has had to double their production capacity by opening a new factory in Taren Point.
March 5, 2025
Days before virus restrictions were imposed, a research team led by the Sydney Institute of Marine Science and Southern Cross University successfully trialled world-first ‘cloud brightening’ technology off the Townsville coast to protect our valuable reef systems from future bleaching events.
April 20, 2020
RADS Operation Manager, Damian Mackey and Head of Engineering, Matt Johnston, represented RADS as part of Australia’s Team Defence Stand at the recent Sea Air Space Exhibition and Conference in Washington DC
April 17, 2025
Unit 19/58 Box Road, Taren Point, NSW 2229 Australia+61 (0)2 9519 0249 | enquiries@ronallum.com | Monday - Friday 08:00 - 17:00 (EST)
Copyright Ron Allum Deepsea Services Pty ltd | Website by Spruiker.co